Business & Tech

US Navy Receives Second Wave of P-8A Poseidon Jets

The Navy plans to purchase 117 P-8As, which are based on the Next-Generation Boeing 737-800 platform.

Boeing announced more P-8A Poseidon aircraft are shipping out on schedule to the U.S. Navy on March 29, marking the first delivery from the second low-rate initial production contract awarded in November 2011.

The maritime patrol aircraft β€” the seventh produced so far in Renton β€” departed Boeing Field in Seattle for Naval Air Station Jacksonville, Fla., where it joined six P-8As currently being used to train Navy crews.

"This is our second P-8A delivery of 2013, and we'll continue to provide the Navy with new Poseidon aircraft at a rate of nearly one a month," said Rick Heerdt, Boeing vice president and P-8 program manager. "We've got a full factory of P-8As for the U.S. Navy and P-8I aircraft for India, and we're working side-by-side with both customers to introduce the aircraft's advanced capabilities into their fleets."

Interested in local real estate?Subscribe to Patch's new newsletter to be the first to know about open houses, new listings and more.

Boeing is on contract to build and support 24 P-8A aircraft as part of three LRIP contracts awarded in 2011 and 2012. The Navy plans to purchase 117 P-8As, which are based on the Next-Generation Boeing 737-800 platform. The versatile multi-mission aircraft provides broad long-range maritime patrol capabilities -- anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance -- and will replace the Navy P-3 fleet.


Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.

We’ve removed the ability to reply as we work to make improvements. Learn more here